KEY INFORMATION
Project Title
MCS Group
Location
Belfast
Main Contractor
Calibro Workspace
Value
£180,000
We carried out the electrical installation on the 10th floor of the Ewart Building, for MCS Group’s new Belfast base. This 11,500sq.ft fit out project created a fresh and vibrant office space, doubling their previous footprint giving room to grow.
With exposed ceilings throughout, suspended lighting was used to illuminate the open plan workspace, and featured a single 75m continuous strip used to highlight the central corridors.