8 F6 G1mk8

MCS Group
Belfast

KEY INFORMATION

Project Title
MCS Group
Location
Belfast
Main Contractor
Calibro Workspace
Value
£180,000

We carried out the electrical installation on the 10th floor of the Ewart Building, for MCS Group’s new Belfast base. This 11,500sq.ft fit out project created a fresh and vibrant office space, doubling their previous footprint giving room to grow.

With exposed ceilings throughout, suspended lighting was used to illuminate the open plan workspace, and featured a single 75m continuous strip used to highlight the central corridors.

Gallery

01
07
Slide arrow prev
Slide arrow next